Wyre Forest House

Brief: We were originally approached by the client to design and cost a gas fired boiler system to supplement the Ground Source heat pump system in times when the load was such that additional heating was required.

Action: We designed and installed a purpose built plant room to locate the new boiler installation and installed services to the main building in pre-fabricated ducts.

The new services were integrated to the original installation via the existing header and commissioned.

Extensive BMS modifications and valve alterations were then implemented which has resulted in the heat pump system operating correctly with no complaints.